Skip to content
Durr Lab @ JHU Logo
  • Home
  • News
  • Research
    • Overview
    • Quantitative Endoscopy
    • Deep Learning
    • Imaging Optical Properties
    • Non-invasive blood analysis
    • Ocular Diagnostics
  • Publications
  • Team
    • Lab Members
    • Openings
    • Alumni
  • Teaching
  • Funding
  • Home
  • News
  • Research
    • Overview
    • Quantitative Endoscopy
    • Deep Learning
    • Imaging Optical Properties
    • Non-invasive blood analysis
    • Ocular Diagnostics
  • Publications
  • Team
    • Lab Members
    • Openings
    • Alumni
  • Teaching
  • Funding
See all our work on Google Scholar
  • All
  • Journal Articles
  • Patents
  • Conference Presentations
  • Proceedings
  • Book Chapters
  • Dissertation

Sickle cell visualization in vivo in humans: microvascular occlusion formation and hemorheological indices

Morakis MM*, Huang L*, McKay GN, Lanzkron S, Pecker LH, Durr NJ.
Blood Advances 2026
[Journal Link] [Preprint]

Learn More

C3VDv2 — Colonoscopy 3D video dataset with enhanced realism

Golhar M, Galeano Fretes LS, Ayers L, Akshintala VS, Bobrow TL, Durr NJ.
arXiv 2025
[Preprint]

Learn More

Multi-contrast laser endoscopy for in vivo gastrointestinal imaging

Bobrow TL, Golhar M, Arayakarnkul S, Song AA, Ngamruengphong S, Durr NJ.
arXiv 2025
[Preprint]

Learn More

Back-illumination interference tomography for imaging weak scattering in thick tissues

McKay GN, Mertz J, Durr NJ.
Optica 12:12 2025
[Journal Link] [Preprint]

Learn More

SAM2Flow: Interactive Optical Flow Estimation with Dual Memory for in vivo Microcirculation Analysis

Huang L, Zhang R, Morakis MM, Taylor-Williams M, McKay GN, Durr NJ.
NeurIPS 2025
[Journal Link]

Learn More

Speckle-illumination spatial frequency domain imaging with a stereo laparoscope for profile-corrected optical property mapping

Song AA, Chen MT, Bobrow TL, Durr NJ.
Journal of Biomedical Optics 30:1 2025
[Journal Link] [Preprint]

Learn More

HalF-SAM: SAM-based Haustral Fold Detection In Colonoscopy with Debris Suppression and Temporal Consistency

Golhar M, Huang L, Durr NJ.
MICCAI 2025
[Journal Link] [GitHub]

Learn More

GAN Inversion for Data Augmentation to Improve Colonoscopy Lesion Classification

Golhar M, Bobrow TL, Ngamruengphong S, Durr NJ.
IEEE J Biomed Health Inform. 29:6 2025
[Journal Link] [Preprint] [GitHub]

Learn More

Perfusion Assessment of Healthy and Injured Hands Using Video-Based Deep Learning Models

Shenoy VR, Kingston CQ, Singh M, Fleming IC, Durr NJ, Chellappa R, Giladi AM.
Plastic and Reconstructive Surgery 2025
[Journal Link]

Learn More

In vivo fundus imaging and computational refocusing with a diffuser-based fundus camera

Simmerer C, Morakis M, Tian L, Gomez-Perez L, Liu A, Durr NJ.
Biophotonics Discovery 2:4 2025
[Journal Link] [Preprint]

Learn More

A Deep Learning Approach for Generating Intracranial Pressure Waveforms from Extracranial Signals Routinely Measured in the Intensive Care Unit

Nair SS, Guo A, Boen J, Aggarwal A, Chahal O, Tandon A, Patel M, Sankararaman S, Durr NJ, Azad TD, Pirracchio R, Stevens RD.
Computers in Medicine and Biology 177 2024
[Journal Link]

Learn More

Thermal Characterization and Preclinical Validation of an Accessible, Carbon Dioxide-Based Cryotherapy System

Hu Y, Gordon N, Ogg K, Kraitchman DL, Durr NJ, Surtees B.
Bioengineering 11:4 2024
[Journal Link] [Preprint]

Learn More

Inexperienced Evaluator Identification of Hand Ischemia Via Video Processed Using Novel Pigment-Enhancing Technology

Horowitz M, Iskandarova A, Yohe G, Rahman S, Durr N, Giladi AM.
J Hand Surg Glob Online 7:1 2024
[Journal Link]

Learn More

Assessing hand perfusion with Eulerian Video Magnification and Waveform Extraction

Rahman S, Iskandarova A, Horowitz ME, Sanghavi KK, Aziz KT, Durr NJ, Giladi A.
Journal of Hand Surgery 49:2 2024
[Journal Link]

Learn More

Colonoscopy 3D Video Dataset with Paired Depth from 2D-3D Registration

Bobrow TL, Golhar M, Vijayan R, Akshintala VS, Garcia JR, Durr NJ.
Medical Image Analysis 90 2023
[Journal Link] [Preprint]

Learn More

Lens free holographic imaging for urinary tract infection screening

McKay GN, Oommen A, Pacheco C, Chen MT, Ray SC, Vidal R, Haeffele BD, Durr NJ.
IEEE Transactions on Biomedical Engineering 70:3 2023
[Cover Article] [Journal Link] [Preprint]

Learn More

Adaptive sparse reconstruction for lensless digital holography via PSF estimation and phase retrieval

Pacheco C, McKay GN, Oommen A, Durr NJ, Vidal R, Haeffele BD.
Optics Express 30:19 2022
[Journal Link]

Learn More

Towards non-invasive blood cell counting and analysis with oblique back-illumination capillaroscopy

McKay GN
PhD Thesis 2022
[Publisher Link]

Learn More

Structured light for data-driven quantitative tissue imaging

Chen MT
PhD Thesis 2022
[Publisher Link]

Learn More

Predicting subjective refraction with dynamic retinal image quality analysis

Gil A, Hernández CS, Nam AS, Varadaraj V, Durr NJ, Lim D, Dave SR, Lage E.
Scientific Reports 12:1 2022
[Journal Link]

Learn More

Deep learning in biomedical optics

Tian L, Hunt B, Bell MAL, Yi J, Smith JT, Ochoa M, Intes X, Durr NJ.
Lasers in Surgery and Medicine 53:6 2021
[Journal Link] [Preprint]

Learn More

A Deep Learning Bidirectional Temporal Tracking Algorithm for Automated Blood Cell Counting from Non-invasive Capillaroscopy Videos

Huang L, McKay GN, Durr NJ
MICCAI 12908:415-424 2021
[Journal Link] [Preprint]

Learn More

Speckle illumination SFDI for projector-free optical property mapping

Chen MT, Papadakis M, Durr NJ
Optics Letters 46:3 2021
[Journal Link] [Preprint]

Learn More

Scattering oblique plane microscopy for in-vivo blood cell imaging

McKay GN, Niemeier RC, Castro-Gonzalez C, Durr NJ
Biomedical Optics Express 12:5 2021
[Journal Link] [Preprint]

Learn More

Improving colonoscopy lesion classification using semi-supervised deep learning

Golhar M, Bobrow TL, Khoshknab MP, Jit S, Ngamruengphong S, Durr NJ
IEEE Access Vol. 9 2021
[Journal Link] [Preprint]

Learn More

EndoSLAM dataset and an unsupervised monocular visual odometry and depth estimation approach for endoscopic videos

Ozyoruk KB, Gokceler GI, Bobrow TL, Coskun G, Incetan K, Almalioglu Y, Mahmood F, Curto E, Perdigoto L, Oliveira M, Sahin H, Araujo H, Alexandrino H, Durr NJ, Gilbert H, Turan M.
Medical Image Analysis 71 2021
[Journal Link] [Preprint]

Learn More

VR-Caps: A Virtual Environment for Capsule Endoscopy

Incetan K, Celik IO, Obeid A, Gokceler GI, Ozyoruk KB, Almalioglu Y, Chen RJ, Mahmood F, Gilbert H, Durr NJ, Turan M
Medical Image Analysis 70 2021
[Journal Link] [Preprint]

Learn More

Establishing a Quantitative Endpoint for Transarterial Embolization From Real-Time Pressure Measurements

Gowda PC, Chen VX, Sobral MC, Bobrow TL, Romer TG, Palepu AK, Guo JY, Kim DJ, Tsai AS, Chen S, Weiss CR, Durr NJ
Journal of Medical Devices 15:2 2021
[Journal Link]

Learn More

A Cartilage Dicing Tool for Rapid Preparation of Rhinoplasty Grafts

Stephanian BA, Karki S, Sharma P, Leo KT, Di Meo MA, Ota M, Patel M, Byrne PJ, Durr NJ
Journal of Medical Devices 14:4 2020
[Journal Link]

Learn More

Rapid tissue oxygenation mapping from snapshot structured-light images with adversarial deep learning

Chen MT, Durr NJ
Journal of Biomedical Optics 25:11 2020
[Journal Link] [Editor's Spotlight] [Cover Article] [Preprint]

Learn More

EndoL2H: Deep Super-Resolution for Capsule Endoscopy

Almalioglu Y, Ozyoruk KB, Gokce A, Incetan K, Gokceler GI, Simsek MA, Ararat K, Chen RJ, Durr NJ, Mahmood F, Turan M
IEEE Transactions on Medical Imaging 39:12 2020
[Journal Link] [Preprint]

Learn More

Imaging human blood cells in vivo with oblique back-illumination capillaroscopy

McKay GN, Mohan N, Durr NJ
Biomedical Optics Express, 11:5 2020
[Journal Link] [Cover Article] [Preprint]

Learn More

A diffuser-based computational imaging funduscope

Li Y, McKay GN, Durr NJ*, Tian L*
Optics Express, 28:13, 2020
[Journal Link] [Preprint]

Learn More

Visualization of blood cell contrast in nailfold capillaries with high-speed reverse lens mobile phone microscopy

McKay GN, Mohan N, Butterworth I, Bourquard A, Sanchez-Ferro A, Castro-Gonzalez C, Durr NJ
Biomedical Optics Express, 11:4 2020
[Journal Link]

Learn More

Development of a low-cost imaging system for remote mosquito surveillance

Goodwin A, Glancey M, Ford T, Scavo L, Brey J, Heier C, Durr NJ, Acharya S
Biomedical Optics Express 11:5, 2020
[Journal Link] [Editor's Pick]

Learn More

GANPOP: Generative Adversarial Network Prediction of Optical Properties from Single Snapshot Wide-field Images

Chen MT, Mahmood F, Sweer JA, Durr NJ
IEEE Transactions on Medical Imaging 39:6 2020
[Journal Link] [Preprint]

Learn More

Deep Adversarial Training for Multi-Organ Nuclei Segmentation in Histopathology Images

Mahmood F, Borders D, Chen R, McKay GN, Salimian KJ, Baras A, Durr NJ
IEEE Transactions on Medical Imaging 39:11 2020
[Journal Link] [Preprint]

Learn More

Curricular Advancement of Biomedical Engineering Undergraduate Design Projects Beyond 1 Year: A Pilot Study

Manbachi A, Logsdon EA, Yazdi Y, Durr NJ
Annals of Biomedical Engineering 48, 2020
[Journal Link]

Learn More

A Novel Intermediate Attachment to Reduce Contamination in Reusable Core Needle Biopsy Devices

Berges A, Callanan M, Zawicki V, Shi R, Metzger S, Athey T, Ayyappan V, Farrell A, Manbachi A, Harvey S, Durr NJ
Journal of Medical Devices 14:1 2020
[Journal Link]

Learn More

SLAM Endoscopy enhanced by adversarial depth prediction

Chen MT, Bobrow TL, Athey T, Mahmood F, Durr NJ
KDD Workshop on Applied Data Science for Healthcare 2019
[Preprint]

Learn More

Validation of an affordable handheld wavefront autorefractor

Rubio M, Hernandez CS, Seco E, Perez-Merino P, Casares I, Dave SR, Lim D, Durr NJ, Lage E
Optometry and Vision Science 96:10 2019
[Journal Link]

Learn More

Learning to Navigate Endoscopic Capsule Robots

Turan M, Almalioglu Y, Gilbert HB, Mahmood F, Durr NJ, Araujo H, Eren Sari A, Ajay A, Sitti M
IEEE Robotics and Automation Letters 4:3 2019
[Journal Link]

Learn More

A Device for Preloaded, Trifolded Grafts to Facilitate Descemet Membrane Endothelial Keratoplasty

Chiang E, Barnes K, Cai S, Chen C, Subramanya A, Chaurasia A, Rosen A, Vora P, Durr NJ, Eghrari AO, Allen R.
Journal of Medical Devices 13:4 2019
[Journal Link]

Learn More

Quality of eyeglass prescriptions from a low-cost wavefront autorefractor evaluated in rural India: results of a 708-participant field study

Durr NJ*, Dave SR*, Lim D, Joseph S, Ravilla TD, Lage E
BMJ Open Ophthalmology 4:1 2019
[Journal Link] [Preprint]

Learn More

Automated detection of neutropenia using noninvasive video microscopy of superficial capillaries

Pablo-Trinidad A, Butterworth I, Ledesma-Carbayo MJ, Vettenburg T, Sanchez-Ferro A, Soenksen L, Durr NJ, Arrate MB, Cerrato C, Humala K, Fabra Urdiol M, Del Rio C, Valles B, Chen Y, Hochberg EP, Castro-Gonzalez C, Bourquard A
American Journal of Hematology 94:8 2019
[Journal Link]

Learn More

DeepLSR: a deep learning approach for laser speckle reduction

Bobrow TL, Mahmood F, Inserni M, Durr NJ
Biomedical Optics Express 10:6 2019
[Journal Link] [Preprint]

Learn More

Structured Prediction using cGANs with Fusion Discriminator

Mahmood F, Xu Wenhao, Durr NJ, Johnson JW, Yuille A
ICLR Workshop Paper 2019
[Open Review] [Preprint]

Learn More

Wide‐field optical property mapping and structured light imaging of the esophagus with spatial frequency domain imaging

Sweer JA, Chen MT, Salimian K, Battafarano RJ, Durr NJ
Journal of Biophotonics (Early View) 2019
[Journal Link]

Learn More

Large dynamic range autorefraction with a low-cost diffuser wavefront sensor

McKay GN, Mahmood F, Durr NJ
Biomedical Optics Express 10:4 2019
[Journal Link] [Preprint]

Learn More

Multimodal Densenet

Mahmood F, Yang Z, Athey T, Durr NJ
arXiv 2019
[Preprint]

Learn More

A Review of Options for Localization of Axillary Lymph Nodes in the Treatment of Invasive Breast Cancer

Woods RW, Camp MS, Durr NJ, Harvey SC
Academic Radiology 26:6 2019
[Journal Link]

Learn More

Comparison of Tri-folded and Scroll-based Graft Viability in Preloaded Descemet Membrane Endothelial Keratoplasty

Barnes K, Chiang E, Chen C, Lohmeier J, Christy J, Chaurasia A, Rosen A, Vora P, Cai S, Subramanya A, Durr N, Allen R, Eghrari AO
Cornea 38:3 2019
[Journal Link]

Learn More

A quantitative analysis of factors influencing lower lid retraction and involutional ectropion

Chen HC, Polisett TS, Zhu K, Phan BN, Durr NJ, Tian J, Mahoney NR
JPRAS 72 (1) 2019
[Journal Link]

Learn More

Validation of a low-cost, carbon dioxide-based cryoablation system for percutaneous tumor ablation

Surtees B, Young S, Hu Y, Wang G, McChesney E, Kuroki G, Acree P, Thomas S, Blair T, Rastogi S, Kraitchman DL, Weiss C, Sukumar S, Harvey SC, Durr NJ.
PLoS One 14:7 2019
[Journal Link] [Preprint]

Learn More

Rethinking Monocular Depth Estimation with Adversarial Training

Chen R, Mahmood F, Yuille A, Durr NJ
arXiv 2019
[Preprint]

Learn More

Single-Element Needle-Based Ultrasound Imaging of the Spine: An In Vivo Feasibility Study

Zhang H, Kim Y, Moghekar A, Durr NJ, Boctor E
MICCAI POCUS Workshop pp 82-89 2018
[Journal Link]

Learn More

Viability of Descemet Membrane Endothelial Keratoplasty Grafts Folded in the Eye Bank

Lohmeier J, Christy J, Chiang E, Barnes K, Cai S, Chen C, Subramanya A, Chaurasia A, Rosen A, Vora P, Durr NJ, Allen R, Eghrari AO
Cornea 37 (11) 2018
[Journal Link]

Learn More

Mapping optical properties of the esophagus using spatial frequency domain imaging

J Sweer
MS Thesis 2018
[Publisher Link]

Learn More

Deep Learning and Conditional Random Fields-based Depth Estimation and Topographical Reconstruction from Conventional Endoscopy

Mahmood F, Durr NJ
Medical Image Analysis 48 2018
[Journal Link] [Preprint]

Learn More

Unsupervised Reverse Domain Adaptation for Synthetic Medical Images via Adversarial Training

Mahmood F, Chen R, Durr NJ
IEEE Transactions on Medical Imaging 37:12 2018
[Journal Link] [Preprint]

Learn More

Deep Learning with Cinematic Rendering: Fine-Tuning Deep Neural Networks Using Photorealistic Medical Images

Mahmood F, Chen R, Sudarsky S, Yu D, Durr NJ
Physics in Medicine and Biology 63 (18), 2018
[Journal Link] [Preprint]

Learn More

Toward dynamic lumbar punctures guidance based on single element synthetic tracked aperture ultrasound imaging

Zhang H, Kim Y, Lin M, Paredes M, Kannan K, Moghekar A, Durr NJ, Boctor E
Journal of Medical Imaging 5(2) 2018.
[Journal Link]

Learn More

Topographical reconstructions from monocular optical colonoscopy images via deep learning

Mahmood F, Durr NJ
IEEE ISBI 216-219, 2018
[Journal Link]

Learn More

Starting a Medical Technology Venture as a Young Academic Innovator or Student Entrepreneur

Manbachi A, Kreamer-Tonin K, Walch P, Gamo NJ, Khoshakhlagh P, Zhang YS, Montague C, Acharya S, Logsdon EA, Allen RH, Durr NJ, Luciano MG, Theodore N, Brem H, Yazdi Y
Annals of Biomedical Engineering 2018
[Journal Link]

Learn More

System for generating synthetic aperture ultrasound images during needle placement

Patel N, Scalabrin E, Kannan K, Gupta K, Chan L, Paredes M, Lin M, Roychoudhury S, Shah S, Moghekar A, Boctor EM, Durr N, Kim Y, Zhang H
PCT Application PCT/US2017/030660 2017

Learn More

Annular beam shaping in multiphoton microscopy to reduce out-of-focus background

Borglin J, Wang D, Durr NJ, Hanstorp D, Ben-Yakar A, Ericson MB
International Journal of Spectroscopy 2017
https://doi.org/10.1155/2017/7560141

Learn More

Apparatus And Methods For Tunable-Lens-Based Refractive Examination

Dave SR, Lim D, Durr NJ
US Provisional Application US 62/350,018 2016.
PCT Application PCT/US2017/037257 2017

Learn More

Toward dynamic lumbar punctures guidance based on single element synthetic tracked aperture ultrasound imaging

Zhang HK, Lin M, Kim Y, Patel N, Moghekar A, Durr NJ, Boctor EM
Proc SPIE Medical Imaging 10135 2017.
DOI: 10.1117/12.2256040

Learn More

Clinical validation of a novel wavefront autorefractor in a base hospital and vision center in rural India

Durr NJ, Dave SR, Lim D, Mahadevan R, Ravilla S, Joseph S, Ravilla TD, Lage E.
ARVO Annual Meeting 2017.

Learn More

Evaluating ex-vivo ocular treatment depth from a low-cost, reusable, CO2-based cryotherapy system

Stone DU, Eberhart C, Vizcaino A, Surtees B, Lee S, Durr NJ.
ARVO Annual Meeting 2017.

Learn More

A team leader model for biomedical engineering design team project-definition training and scalable clinical observation

Logsdon EA, Allen R, Durr NJ, Nguyen H
ASEE Annual Conference 2017.

Learn More

The Feasibility and Optimization of a Percutaneous Carbon Dioxide-based Cryoprobe.

Surtees B, Lee S, Lee B, Trakru S, Rex M, Kang Y, Jois N, Hui A, Harvey S, Durr NJ
BMES Annual Meeting 2016.

Learn More

Design and clinical evaluation of a handheld wavefront autorefractor

Durr NJ, Dave SR, Vera-Diaz FA, Lim D, Dorronsoro C, Marcos S, Thorn F, Lage E.
Optometry and Vision Science 92:12 2015.
DOI: 10.1097/OPX.0000000000000732

Learn More

Tripling the maximum imaging depth with third-harmonic generation microscopy

Yildrim M, Durr NJ, Ben-Yakar A.
Journal of Biomedical Optics 20:9 2015.
DOI: 10.1117/1.JBO.20.9.096013

Learn More

Imaging Colonic Surface Topography With Photometric Stereo Endoscopy

Durr NJ, Parot V, Traverso G, Puricelli WP, Vakoc BJ, Nishioka NS, Gonzalez G.
DDW 2014 Gastrointestinal Endoscopy 79:5 2014.
DOI: 10.1016/j.gie.2014.02.676

Learn More

Feature space optimization for virtual chromoendoscopy augmented by topography

Gonzalez G, Parot V, Lo W, Vakoc BJ, Durr NJ
Medical Image Computing and Computer Assisted Intervention Society 17:641-649 2014.
DOI: 10.1007/978-3-319-10404-1_80

Learn More

From Unseen to Seen: Tackling the Global Burden of Uncorrected Refractive Errors

Durr NJ, Dave SR, Lage E Marcos S, Thorn F, Lim D.
Annual Review of Biomedical Engineering 16 2014.
DOI: 10.1146/annurev-bioeng-071813-105216

Learn More

Apparatus and method of determining an eye prescription

Durr NJ, Lage E, Dave S
WO Application PCT/US2014/045305 2014.
Google Patent Link
US Patent 9,854,965 2018.
US Patent Link

Learn More

Three dimensional imaging techniques for improved colonoscopy

Durr NJ, Gonzalez G, Parot V
Expert Review of Medical Devices 11:2 2014
DOI: 10.1586/17434440.2013.868303

Learn More

A Novel Pilot Study Using Spatial Frequency Domain Imaging to Assess Oxygenation of Perforator Flaps During Reconstructive Breast Surgery

Nguyen JT, Lin SJ, Tobias AM, Gioux S, Mazhar A, Cuccia DK, Ashitate Y, Stockdale A, Oketoun R, Durr NJ, Moffitt LA, Durkin AJ, Tromberg BJ, Frangioni JV, Lee BT.
Annals of Plastic Surgery 71:3 2013.
DOI: 10.1097/SAP.0b013e31828b02fb

Learn More

Photometric Stereo Endoscopy

Parot V, Lim D, Gonzalez G, Traverso CG, Nishioka NS, Vakoc B, Durr NJ
Journal of Biomedical Optics 18:7 2013.
DOI: 10.1117/1.JBO.18.7.076017

Learn More

Apparatus and method of determining an eye prescription

Durr NJ, Lage E, Dave S, Diaz CD, Celestino SM, Lim D
WO Application PCT/US2014/045261 2014.
Google Patent Link

Learn More

Photometric stereo endoscopy

Durr NJ, Parot VJ, Lim D, Gonzalez G.
WO Application PCT/US2014/026881
Google Patent Link

Learn More

Multiphoton Luminescence from Gold Nanoparticles as a Potential Diagnostic Tools for Early Cancer Detection

Durr NJ, Ericson MB, Ben-Yakar A.
Biosensors and biodetection technologies for cancer detection, diagnostics and research CRC Press 2011
DOI: 10.1201/b12138-23

Learn More

First-in-human pilot study of a spatial frequency domain oxygenation imaging system

Gioux S, Mazhar A, Lee BT, Lin SJ, Tobias AM, Cuccia DJ, Stockdale A, Oketokoun R, Ashitate Y, Kelly E, Weinmann M, Durr NJ, Moffitt LA, Durkin AJ, Tromberg BJ, Frangioni JV.
Journal of Biomedical Optics 16:8 2011.
DOI: 10.1117/1.3614566

Learn More

Fast-updating and non-repeating Lissajous image reconstruction method for capturing increased dynamic information

Hoy CL, Durr NJ, Ben-Yakar A.
Applied Optics 50:16 2011.
DOI: 10.1364/AO.50.002376

Learn More

Apparatus and method of determining an eye prescription

Durr NJ, Lage E, Dave S, Diaz CD, Celestino SM, Lim D
US Provisional Application US 61/972,058 2013.

Learn More

Apparatus and method of determining an eye prescription

Durr NJ, Lage E, Dave S
US Provisional Application US 61/972,191 2011.

Learn More

Photometric stereo endoscopy

Durr NJ, Parot VJ, Lim D, Gonzalez G.
US Provisional Application 61/780,190 2011.
Google Patent Link

Learn More

Maximum Imaging Depth of Two-Photon Autofluorescence Microscopy in Epithelial Tissues

Durr NJ, Weisspfennig CT, Holfeld BA, Ben-Yakar A.
Journal of Biomedical Optics 16:2 2011.
DOI: 10.1117/1.3548646

Learn More

Nonlinear imaging with endogenous fluorescence contrast and plasmonic contrast agents

Durr NJ
Ph.D. Dissertation 2010.
The University of Texas, Austin

Learn More

Method for evaluating extracellular water concentration in tissue

Baker CR, Schmitt J, Campbell S, Durr N, Hoarau C, Ostrowski R, Debreczeny MP
US Patent 7,657,292
Google Patent Link

Learn More

Thermal analysis of gold nanorods heated with femtosecond laser pulses

Ekici O, Harrison RK, Durr NJ, Eversole DS, Lee M, Ben-Yakar A.
J Phys D-Appl Phys 41:18 185501 2008.
DOI: 10.1088/0022-3727/41/18/185501

Learn More

Femtosecond laser nanoaxotomy lab-on-a-chip for in vivo nerve regeneration studies

Gou SX, Bourgeois F, Chokshi T, Durr NJ, Hilliard MA, Chronis N, Ben-Yakar A.
Nature Methods 5:6 531-533 2008.
DOI: 10.1038/nmeth.1203

Learn More

Miniaturized Probe for Femtosecond Laser Microsurgery and Two-Photon Imaging

Hoy CL, Durr NJ, Chen P, Piyawattanametha W, Ra H, Solgaard O, Ben-Yakar A.
Optics Express 16:13 2008.
DOI: 10.1364/OE.16.009996

Learn More

Two-photon luminescence imaging of cancer cells using molecularly targeted gold nanorods

Durr NJ, Larson T, Smith DK, Korgel BA, Sokolov K, Ben-Yakar A.
Nano Letters 7:4 941-945, 2007.
DOI: 10.1021/nl062962v

Learn More

Method and apparatus for spectroscopic tissue analyte measurement

Baker CR, Durr NJ, Mogri M, Hoarau C, Ostrowski R, Debreczeny MP
US Application US11716482
Google Patent Link

Learn More

A novel method to determine lean body water using localized skin biopsies: correlation between lean skin water and lean body water in an overhydration model

Campbell SE, Ostrowski R, Hoarau C, Durr N, Debreczeny MP.
American Journal of Physiology 291 2006.
DOI: 10.1152/ajpregu.00164.2006

Learn More
Copyright 2023 Durr Lab | All Rights Reserved
Page load link
Go to Top